EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Utah-Jay
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (285)
Boot Cowl
- (17)
Workshop
- (1)
Empennage
- (2)
Fuselage
- (69)
Firewall
- (4)
Tail Feathers
- (9)
Wings
- (9)
Controls
- (17)
Avionics
- (35)
Lighting
- (3)
Instrument Panel
- (2)
Landing Gear
- (16)
-
Brakes
-
Changed tires
-
Cotter Pins and...
-
Back on the Gear
-
Gear Covered
-
Drilled and set the...
-
Brake lines
-
Mounted the landing...
-
Axle
-
Wheels and Tires
-
Brake Torque Plates
-
Torque Plate...
-
Tires
-
Installed the...
-
Strut Assembly
-
TailWheel
Engine
- (30)
Propeller
- (1)
Fuel System
- (8)
Interior Finish
- (8)
Paint / Decals
- (8)
Inspection
Tools
- (1)
Engine Cowl
- (31)
Doors
- (1)
Baffling
- (12)
Cabin Air
- (1)
Builder Name:
JAY TOWNSEND
-
Project:
Companion
-
VIEW REPORTS
Total Hours:
1317.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Oct 21, 2021 - No Finish Date
Engine:
Barrow Lycoming O-360
Propeller:
Sensenich 82” GA
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=Utah-Jay
Home or Last Project Picture
Dec 16, 2021
Mounted the landing gear, wheels and tires
- (2 hours)
Category: Landing Gear
Finally got the AN6-6 bolts to attach the brake torque plate to the gear legs. This allowed me to then put on the brakes, wheels and tires for the first time.
Torque plates are each attached with two AN-5 bolts using bushings (due to clearance on the bolts) and two AN6-6 bolts
2E2F8BEA-6376-473D-A30A-1502EF29C332.jpeg
1EE0D652-06E5-41EB-AC9E-D12000E7F44D.jpeg
23AC5FEA-88C4-46FA-9340-6D2F25B3CB50.jpeg
11259319-91A9-44DC-A2B0-ADD17678FFB0.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.